Projects


A two-story residential building experienced significant settlement due to non-Engineering design very soft alluvial soil conditions and a high-water table, causing extensive structural cracks. The alluvial soil, characterized by high void ratios, low bearing capacity, and low shear strength, led to differential settlement, with the extension side settling more severely. The floor slab sank approximately 20mm, resulting in popped tiles and ceiling collapses. As a result, the building was deemed dangerous and unsafe for residents.
Stabilizing Subsided Residential Foundation with PU Injection on alluvial soft clay, Klang Selangor


Stabilizing a Pool Deck: PU Injection & Cement Grouting for Sinkhole Repair at Damansara Heights – Kuala Lumpur
A private residential swimming pool experienced significant soil settlement, leading to a noticeable sinkhole formation beneath the pool deck. This posed a structural risk to the pool and surrounding landscape. Immediate remediation was necessary to stabilize the ground and prevent further subsidence.Poor compaction of backfill soil during construction, causing gradual settlement.High water table or underground drainage issues, leading to washout of fine soil particles.
Contractor
Re-Level is a specialist leader in ground engineering and asset preservation, providing innovative, advanced solutions for site-specific challenges, including sunken foundations, in residential, industrial, commercial, civil, and earthquake-damaged areas.
© 2024. All rights reserved.